Long Lake Hydroelectric Project

This project consisted of the supply and installation of a complete electrical installation for a 250 man camp including dorms, kitchen, offices and recreation facilities. The main power source was from BC Hydro and included an 800 amp 120/208 volt distribution to the camp equipment.

BV Electric also provided a complete generation container with two new 36KW Kubota Generators.BV Electric completed the project by providing all the technical service for the powerhouse as well.

Have a look at the following link for more information: Long Lake Hydroelectric Project