Complete May 2011
Gunnar Mine Project
The Gunnar project included the design, layout and installation of a complete electrical system for a 50 man mine camp in Uranium City, Saskatchewan. The system included two Cat 500KW 480V generators, wastewater and water treatment equipment, modular kitchen and dorms.